High Temperature Pre-Molded Perlite Fitting Covers
Installation

Prefabricated parts are the wave of the future. Sproule Pre-Molded High Temperature Perlite Fitting Covers can be installed quicker and more efficiently than mitered elbows, saving labor and installation time.


Step 1


Step 2

Step 3

Step 4

Step 5
Installed

Sproule High Temperature Pre-Molded Perlite Fitting Covers can be installed in five easy steps. No need to dig out the inside to ensure the fitting cover seats itself onto the pipe fitting. No rasping down of the outside edges of each miter is necessary to make the aluminum Ell-Jac fit properly.